Skip to Construction Projects site navigationSkip to main content

H-Wing Les Paul Studio

Project 2014-02-01C

This project involves alteration of a control room and recording studio within the H-Wing 2nd floor Les Paul Studio.  Alterations will include elimination of a window, relocations of doors, extension of mechanical and electrical systems, and addition of equipment.  Bids will be received for a single lump sum contract covering all work indicated in the construction documents.

MANDATORY PRE-BID MEETING AND SITE INSPECTION: 10:00 A.M. Tuesday, February 17, 2015 in the H-Wing, room H-208A.  If because of inclement weather the College is closed on this day, the mandatory pre-bid meeting and site inspection will be held on the next business day the College is open at the same time and location.

LAST DAY FOR QUESTIONS: Tuesday, February 24, 2015 by 2:00 P.M.  E-mail to Seamus Doran, sdoran@ramapo.edu

ADDENDUM #1 TO BE ISSUED: Friday, February 27, 2015.

RFP SUBMISSION DEADLINE: Tuesday, March 10, 2015 at 2:00 P.M.  Deliver all RFP submissions to the Ramapo College Purchasing Department, D-Wing, room D-116.

Contact Person: Seamus Doran, sdoran@ramapo.edu

All bid documents are posted below.  Please use Firefox Safari, or Chrome to view the files.

2014-02-01C Bid Documents: 2014-02-01C Construction Document Specifications – Volume I (zip)

2014-02-01C Drawings:

Mandatory Pre-Bid Meeting and Site Inspection Sign-In Sheet: 2014-02-01C Sign-InSheet  (pdf)

Addendum #1: H-Wing 2nd Floor – Les Paul Studio (RCNJ #2014-02-01C) Addendum No 1  (pdf)

Bid Results: 2014-02-01C BidSheet (xls)

PROTEST DOCUMENTS:

Bid Protest – Final Decision  (pdf), Exhibit 1 See construction documents and drawings posted above, Exhibit 2 (pdf), Exhibit 3 (pdf), Exhibit 4 2014-02-01C_Slate_BidResponse (pdf), Exhibit 5 2014-02-01C_Brahma_BidResponse (pdf), Exhibit 6 2014-02-01C_CatCord_BidResponse (pdf), Exhibit 7 (pdf), Exhibit 8 (pdf), Exhibit 9 (pdf), Exhibit 10 (pdf), Exhibit 11 (pdf), Exhibit 12 (pdf), Exhibit 13 (pdf), Exhibit 14 (pdf), Exhibit 15 (pdf)